The stream was dammed up to form ornamental lakes.
2
粘土料场首先进行表土的临时堆存,同时布设临时堆土区临时拦挡、临时排水和临时覆盖等措施。
Normally, the extracting soil areas firstly need to temporally store the surface soil, meanwhile, temporary block measures, temporary drainage projects and temporary cover should be taken.
Debris bam was added to the model to simulate the impulse force of debris flow to the dam and the variety of debris flow field after adding the dam based on the cleuch 3D land form model.