In this system, tool means is adopted, mixed technological decision based on example and knowledge is constructed, sequence Graph is obtained by model reconfiguration and feature assembling.
Features of assembling process are further studied based on it, and an interruptible multiprocessor-sorting model that has precedence constraints and different preparation duration is obtained.