As an advanced method, the CPM should be combined with the Gantt chart in construction management, and it can be especially well used in tendering.
2
[摘要]在工程施工进度网络计划基础上,提出绘制施工进度计划综合横道图的思路及绘制步骤。
Abstract: Based on the construction schedule network planning, this paper puts forward the idea and draw steps of compositive horizontal line graph to construction schedule.