Finally, through the pilot the paper analyzed the construction sequence of the CRCP and its end fixing equipment, and the corresponding quality checking standards.
The foam shall be tested in accordance with the method set out in BS 5852: Part 2 using cover fabric corresponding to the specification set out in paragraph 2 below.