In traditional reservoir capacity calculation, a planimeter is used to obtain a reservoir capacity from topographic maps and large scale topographic maps are needed if high accuracy is required.
The method computes topological operator based on label, verdicts and merges the spatial relationship of geometric, expresses and displays the multi-scale of spatial data.