This paper introduces the concept and the method of calculating installation sequential capacity for run-of-river hydropower stations.
2
公伯峡水电站机电安装的监理工作目标是进行三大控制,其中质量控制是监理的核心工作。
Three controls are the objective of engineering supervision for Gongboxia hydropower station, of which the quality control is the core work in the engineering supervision.
3
水电站龙门起重机:主要用来吊运和启闭闸门,也可进行安装作业。
Hydropower Station Gantry Crane: mainly used for lifting and opening and closing gates, but also the installation.