This paper states the viewpoint that the exceeding long temperature crack and settlement crack in concrete structure can be solved by later casting zone.
The designer can set post-pouring belt, using UEA con- crete and designing pre-stressing concrete structure to avoid the crack caused by temperature and shrinkage.
3
温度应力计算时应考虑混凝土浇筑时间的不同、后浇带的设置对温度应力的影响。
While calculating the thermal stress, the influence of concreting time and the arrangement of post-pouring belt on the thermal stress should be considered.