Xiluodu Hydropower Station ; Xiluodu Hydropower Project
双语例句
1
溪洛渡电站装机1260万千瓦,相当于4个二滩电站,其工程综合技术难度位居世界前列。
The total installed capacity of Xiluodu hydropower station amounts to 12600MW that is 4 times of Ertan station, and its comprehensive technical difficulty is on top of the world.
2
向家坝、溪洛渡两电站为金沙江开发的第一期工程。
Xiangjiaba and Xiluodu hydroelectric stations will be the first stage works of developing the Jinshajiang River.
3
用多种检测方法对溪洛渡水电站当地的玄武岩人工骨料的碱活性进行了大量的试验研究。
A large number of experiment studies are performed for basalt crushed aggregate alkali activity by different test methods at site of Xiluodu hydropower station.