Condensate as well as the wash water for the GGH is drained through the corresponding drain system into the absorber pit.
2
首次建立燃煤电厂湿法烟气脱硫系统中烟气换热器综合性能评价的模糊数学模型。
The fuzzy mathematic model to evaluate the comprehensive performance of flue gas heat exchangers in the wet flue gas desulfurization system of power plants was established for the first time.
3
因此在进入烟囱之前,必须被再度加热而使烟囱不结露,因此烟气换热器就被运用了。
Before entering the existing stack the flue gas has to be reheated to protect the stack against condensates. For reheating the gas gas Heater (GGH) is used.