This article gives the construction procedure and instructions for on-site casting of continuous concrete box beam with mobile mould.
2
重点介绍了采用现浇混凝土薄壁筒桩处理软基的施工工艺和技术要点。
This paper introduces the construction technologies and key technical points for weak subgrade treatment with the thin cast-in-place concrete cylindrical piles.
3
摘要介绍了蒸汽锅炉耐火混凝土炉墙现浇成型施工工艺。
The technology of instant concret steam boiler shelling is introduced.