The draft of precipitator's remake in Fossile Power Plant is introduced, and reasonable optimization is discussed.
2
介绍了火力发电厂除尘器改造工程的设计方案,论述了工程改造前及改造中如何做到合理优化的方法及依据。
This paper introduces the design scheme of precipitator retrofit project of thermal power plant, discusses the methods and bases of rational optimization before and during retrofit.
3
燃煤电厂所使用的电除尘器常常会出现反电晕和电晕封闭现象,导致除尘效率不高。
The phenomena of back corona and corona obstruction often take place in electric precipitators of coal-fired power plants and lead to low dust removal efficiency.