The seepage and boiling of sand on the uniform isotropic gravel base of dam can be reduced to completely penetrating well and nonpenetrating well model.
2
桩基是土木工程各种施工中常见的地基处理方法,但桩基施工最怕出现不良地质,尤其是涌砂。
The pile foundation is a method of disposing the foundation, it is unfavorable to encounter sand flow in the pile foundation.
3
通道的规模取决于涌砂口的流量大小和水位高低,尤其在较低水位时通道规模将最大。
The size of the channel depends on the flow and water level at the sand gushing opening, and in particular, maximum channel size is possible at low water level.