The dam for the Nuozhadu Hydropower Station is located in an area with small valley coefficient, poor construction conditions and difficult arrangement of access roads to dam crest.
2
糯扎渡水电站建设规模大,环境影响因素多且涉及面广。
The construction of Nuozhadu Hydropower Station is large in construction scale with many environment impact factors and wide involving aspect.
3
糯扎渡水电站地下引水发电系统不仅施工难度大,而且施工工期长、干扰多。
The construction of the underground water diversion and power generation system of Nuozhadu Hydropower Station is difficult and has a long construction period and many disturbance factors.