New thundering earthing system, reinforced strut frames for existing structures and monitoring system were installed to insure the safety and operation of Terminal 2 building.
2
机场于是转而清出空间,将电子票务服务站和柜台摆放成一个通向航厦入口的角度,分散要搭飞机的旅客。
Instead, airport are clearing out the space, setting electronic kiosks and counters at an Angle to the entryway, and spreading out passengers needing to catch their planes.
3
在桃园国际机场第二航厦下方,预留了捷运机场线的隧道,由于新规划的路线改变,需要扩大该隧道断面;
An existing tunnel beneath Terminal 2 building reserved for the Taoyuan International Airport Link Metro Project was enlarged to accommodate the new alignment of Metro rail.