The problems are also presented of the capacity match with supplementary equipment and the manufacture of domestic large-scale reduction gear.
2
调查了国内30家润滑脂生产企业的生产装置能力、设备及工艺现状。
The current plant capacity, equipment and technology status of 30 domestic grease producers are investigated.
3
提出聚酯装置能力应和下游装置能力相匹配,一并进行建设,才能取得最佳经济效益。
It was suggested that a polyester unit should be simultaneously constructed with the downstream units well matched in capacity, thus the optimal economic benefits could be gained.