House Covered Area includes the Saleable Area and area of Carport, Filtration Plant Room, A/C Room and Facilities Room.
2
垂直环流、电梯井、厕所和技术设备房等基本元素布置高效,以便空出其他表面。
Essential elements, such as vertical circulation, elevator shafts, toilets and technical premises are efficiently distributed so as to free up the other surfaces.
3
通过工程实例与卤代烷系统的比较,论证了水喷雾系统用于高层建筑燃油设备房的可行性和经济性。
And also, this thesis studies the feasibility and economy for the fire water spray extinguisher system installed in fuel equipment house in high rise building by the comparison between the fi...