Not only will this make for an unhappy engineer, but people waiting for the E-mail server may get upset at the length of time it takes to restore functionality.
2
结论认为:渭河流域设计洪水计算中,可既不考虑水库工程影响还原,也不考虑设计条件下工程的影响。
The conclusion is: in calculation of design flood in the Weihe River basin, neither reduction of reservoir project impact nor project impact under design conditions can be considered.
Schlumberger used CFD to design a testing program, ensuring it was as close to real well conditions as possible, and focused on the scenarios of most interest.