In combination with steel box girder construction by incremental launching method, the paper introduced the construction technique of variable depth curved steel continuous box girder.
2
最后对简支连续梁桥的设计方法和施工工艺进行了总结,对其设计和施工的有关问题提出指导建议。
At last, it made a summary about design methods and construction technology, and suggested some related problems about design and construction.