The case study of irrigation management during the winter wheat growing season at Zhengzhou eco-site in 1991, 1992 was conducted to analysis the optimum irrigation scheduling.
3
摘要: 本文通过郑州市某快速路工程和绍兴市某大桥工程实例,介绍工程项目如何进行成本管理。
Abstract: : Through the examples of expressway project in Zhengzhou and a bridge engineering in Shaoxing, this article introduced how to carry out cost management project.