The arch rib have been fabricated longitudinal by 7 segments, and used the non-support cable crane installation and the steel cable diagonal-tension method.
2
在锚堆放的位置应安装有用于固定锚的镀锌钢丝绳和松紧螺旋扣。
Galvanized Steel wire and turn buckle for securing anchor in stowed position to be provided.
3
吊具上臂的连接孔穿有连接卸扣,连接卸扣连接主钢丝绳吊系;
The connecting hole on the upper arm of the hoist is penetrated by a connecting shackle connected with a main steel cable hanging rope.