Based on the demand of present code, using the calculation of bearing capacity of pile shaft and subgrade bearing capacity for pile, vertical experimental load of embedded rock pile is ensured.
2
对4 0 8根工程桩,根据规范要求,抽取4根,进行竖向静载试验,承载力都超过设计要求。
The single bearing capacity all surpass the demand of designed capacity by vertical quiescently loaded test with 4 piles among 408 construction piles in accordance with related code.