The authors described the structure of a newly - developed wedge-tube bolt, its reinforcement principles and anchoring performance, and the results of in situ pull test and productive applications.
2
本文提出了锚拉抗滑桩锚拉力计算的桩顶位移控制法,计算控制桩顶位移所需的最小锚拉力。
The thesis puts forward the pile-top displacement control method, and it can account the least force of the anchor wire on anti-slide pile.
As a new installation method for big structures, double girder integral lift is mainly composed of fixed girder, moveable girder, work anchor, moveable anchor, jacks and guide rail.