Then calculating methods on construction camber of cast-in-place beam scaffold and setting methods are introduced.
2
本文在对现行的基于相对挠度的预拱度计算设置方法进行分析后,进而提出了新的绝对挠度法。
The pace analyzes the current pre-arched calculation and installation method based on the relative deflections, and proposes a new absolute deflection method.
3
讲述悬臂施工设置预拱度的原理,从而推导曲线桥悬浇施工时预留位移的一般计算公式。
Describe the principles of setting camber in the process of cantilever construction and deduce the general formulas for its calculation.