The results of experiments and engineering show that it is feasible to adopt dry compaction procedure for subgrade construction road.
2
文章基于210国道沙区筑路的实践,介绍了风积沙的特征和湿压实法施工工艺。
Based on the practice of building the road in the sand area of national road 210, this paper introduced the feature of aeolian accumulation sand and the construction craft of waterish impaction style.
3
最后还总结了针对稳定风积沙基层的路面防裂措施的设计方法和施工工艺。
Finally, the thesis summarizes the design methodology and construction technique in preventing from pavement cracking caused by the stabilized-sand base.