This paper presents a design example of using a cable crane for lifting and erecting an access bridge for the right bank spillway tunnel for the Lubuge Hydropower Station.
2
鲁布革水电站心墙堆石坝采用总应力法和有效应力法计算程序进行计算和分析。
The calculation and analysis of the core type rockfill dam of Lubuge Hydropower Station are conducted by the programs of total stress method and effective stress method.
3
本文以鲁布革水电站溢洪道岩质边坡为例,叙述了有关边坡稳定分析的概率统计方法。
In this paper the probabilistic and statistical analysis of stability of rock slope with the example of Lubuge hydroelectric power station is described.