中英
龙滩水电站
  • 简明
  • 网络释义
  • 专业释义
  • 1

     Longtan Hydroelectric Power Plant

    Hydroelectric power plant automation 水力发电站自动化 Longtan Hydroelectric Power Plant 龙滩水电站 TGP hydroelectric power plant 三峡水电站 ..

  • 双语例句
  • 1
    地下厂房进水口高边坡稳定是水电建设必须解决的重大工程技术问题。
    The stability of high side slope in underground powerhouse intake is an important techniqchal problem that should be resolved during construction of Longtan hydropower station.
  • 2
    引入专家系统和采用计算机模拟技术研究水电大坝碾压混凝土的运输方案。
    In this paper, the expert system and computer simulation techniques are introduced to study the transportation alternatives of RCC at Longtan hydropower station.
  • 3
    结合百水电下闸首基础石方开挖工程,详细介绍了该技术的爆破参数计算。
    The blasting parameter calculation of the technology is analyzed with the discussion on the rock excavation of the first foundation in next floodgate of Bailongtan hydroelectric power station.
查看更多
  • 百科
  • 龙滩水电站

    龙滩水电站是南盘江红水河水电基地10级开发方案的第四级,是红水河开发的控制性水库。上游为平班水电站,下游为岩滩水电站。流域面积98500平方公里,占总流域面积的71%,坝址多年平均径流量5l7亿立方米。龙滩“按正常蓄水位400米设计,375米建设”,前、后期装机容量分别为420万千瓦、630万千瓦,占红水河十级总容量的35%与40%;年发电量分别为156.7亿千瓦时与 187.1千瓦时。占十级总发电量的30%。前、后期总库容分别为162.1亿立方米与272.7亿立方米,调节库容分别为l11.5亿立米与205.3亿立方米,前期为年调节水库,后期则跨入多年调节。

查看更多