...评审的几个问题剖析-建筑经济 关键词] 报价评审;合同类型;低于成本价;实质性要求 [gap=401]Key words: bid price evaluation; contract form; bid price below cost; substantive requirements ..
基于16个网页-相关网页
Construction bid price evaluation 建筑工程投标价格评估 ; 建造投标价格的评估
baseline price for bid evaluation 评标基准价
minimum price bid evaluation 最低价评标法
Abstract: Bid price evaluation is the key process throughout the contract life cycle, and it directly influences the signing and execution of contract.
[摘要]投标价格评审是工程合同形成和执行过程中的关键工作,它直接影响到合同价的合理确定和有效执行。
Lowest bid price method, value and function system analysis method were mostly used in evaluation of bid.
目前评标中最常用的方法有两种,即经过评审的最低投标价法和综合评估法。
The bid procedure and tender evaluation model that this paper puts forward consider comprehensively the tender duration, bidding price, technology and comprehensive strength of contractor.
本论文提出的招标程序及评标模型,考虑了投标报价、投标工期、承包商的技术和综合实力。
应用推荐