This is a key foreign cooperation project of Sinopec. Throughresearch on management of the project, the following conclusions areachieved: full preparations should be made; comprehensive equipmentupgrading and personnel training should be arranged strictly in accordancewith contract requirements; plans should be fully predictable; sufficientlarge-consumption materials should be reserved; all the clauses and itemsin contract should be made clear to all the main management personnel; allwork should be carried out under the guidance of the contract; strengthencommunication with Party A to avoid conflict as possible; local attorneyshould be employed in preparation of subcontract contract to supervise theconstruction program of subcontractor; strengthen French training andunderstand local laws and custom; pay attention to the time limit and strategy of claim indemnity, not unilaterally seek claim indemnity; deploymore labor power in the first stage of procurement and then reduce it stepby step; authorize local custom clearance agent to strengthen managementon materials transportation and expenses control; comprehensively adoptthe bidding system; reinforce file information management, laid stress onplanning of documentation and standardized file content; highlightdevelopment and utilization of networks and computer; standardize qualitysystem by document form; lay special emphasis on operators and reinforcepublicity; establish clear rewards and punishment system on quality issues;establish applicable QHSE prospectus; focus on field QHSEmanagement; guarantee health, especially psychological health, ofemployees; establish and maintain good relations with local government orsociety; make full use of local resources; adopt local persons for lessimportantposts as possible.
该项目是中石化对外合作的重点项目,通过对该项目的管理研究认为:项目前期准备必须充分,要严格按合同要求进行全面设备整改和人员培训,计划要有充分的预测性,消耗量大的物资的储备要有较大的富裕度;主要管理人员必须清楚合同的所有条款,以合同条款指导工作,严格控制合同进度,加强与甲方沟通交流,尽量规避矛盾;分包工作一定要聘请当地律师参加分包合同准备工作,并监督分包商的施工进度;培养合同管理人才,加强法语培训,学习当地法律习俗,注意索赔的时效性和策略,不片面追求索赔;采购工作前期投人人力要多然后陆续减少,聘用当地清关代理公司,加强货物运输管理和监督,注重完善物资采购信息系统,全面采用采购招投标制;重视信息资料管理利用;加强安全检查,侧重对操作人员的约束性,加强宣传,对QHSE问题采取手段跟踪纠正;制定符合实际的QHSE计划书,合理使用配套设备,制定详细措施,以作业现场QHSE管理工作为重点,保证员工的身体健康特别是心理健康;重视对风险的防范,充分利用当地资源,对于次要操作层面的人员尽可能本地化。
参考来源 - 阿尔及利亚扎尔则油田提高采收率项目的管理研究·2,447,543篇论文数据,部分数据来源于NoteExpress
The main points of claim indemnity consciousness and management in engineering construction are explained.
工程变更与索赔,是在工程实施阶段的风险管理工作中的重要内容。
Responsible of assuming Party b's all the lost and casualties due to suffering of the claim indemnity that proposed by foreign importer.
在国外进口商提出索赔时,负责承担乙方因该索赔所遭受的一切损失和后果。
The theme inquires into the ways of the contractor transferring the risks from construction guarantee, construction insurance and claim indemnity.
本文从工程担保、工程保险和工程索赔三个方面探讨了承包商转移风险的途径。