... commissioning operation 试运行 commissioning date 启用日期 ; 投产日期 Commissioning PG 开通调测 ; 试运行前的开通调测 ...
基于274个网页-相关网页
The coordinating control system and the pre commissioning operation of the Waigaoqiao Power Plant's No. 2 unit are described.
介绍了外高桥电厂2号机组的协调控制系统方式及试运情况,运行状况良好。
"Proper use" means installation, commissioning, operation and maintenance in accordance with the Contractor's advice and good engineering practice.
“正确使用”系指根据供应方的建议和良好工程实践进行的安装、调试、操作和维护。
应用推荐