High concrete gravity dam 高混凝土重力坝
rolled concrete gravity dam 碾压混凝土重力坝
Guandi Concrete Gravity Dam 官地混凝土重力坝
Yunfeng concrete gravity dam 云峰混凝土重力坝
longkou concrete gravity dam 龙口重力坝
Nuozhadu concrete gravity dam 糯扎渡混凝土重力坝
roller compacted concrete gravity dam 碾压混凝土重力坝
roller-compacted concrete gravity dam 碾压混凝土重力坝
concrete gravity-arch dam 混凝土重力拱坝
The dam in Guangzhao hydropower station is the highest roller compacted concrete gravity dam in China at present.
光照水电站大坝为目前国内在建的最高的碾压混凝土重力坝。
It also includes a consideration of possible alternatives, such as a concrete gravity dam or an earth-fill embankment dam.
还要考虑到可能的备选方案,比如是选择混凝土重力坝还是选择填土筑堤大坝。
A concrete gravity dam with 1 ~ 2 longitudinal seams and level keyways in seam surface was grouted when the concrete stays a stable temperature.
某大坝是混凝土重力坝,根据温控要求,坝体设置1 ~ 2条纵缝,缝面设置水平键槽,在坝体混凝土达到稳定温度后进行接缝灌浆。
应用推荐