Based on the hazard of Yaocuntang arch tunnel engineering in the highway from Jingdezheng to Huangshan,the paper illustrated the necessity of field monitoring measurement in tunnel construction. By site monitoring,such as ground settlement,clearance convergence,vault crown settlement and site observation, etc.
以景(德镇)婺(源)黄(山)高速公路姚村坦连拱隧道施工中出现的险情为例,结合地表沉降、洞内净空收敛及拱顶下沉进行观测及现场观察,针对隧道出口段围岩失稳导致中导洞右侧工字钢严重内敛现象进行了动态预报,从而为及时采取有效措施排除险情争取了时间,避免了重大事故的发生,以此进一步说明了监控量测在隧道修建过程中的必要性。
参考来源 - 监控量测在姚村坦隧道施工险情预报中的应用·2,447,543篇论文数据,部分数据来源于NoteExpress
The ground surface settlement, crown settlement, convergence of surrounding rock, etc, are monitored and measured during the Fantun tunnel construction of Jianxing Highway.
在建兴高速樊屯隧道施工过程中,对地表沉降、拱顶下沉、围岩收敛等进行了监控测量。
At the same time, based on the measured data of vault crown settlement, a grey-synergetic prediction model is established by use of the grey theory and the synergetic theory.
并结合灰色理论和协同学理论,基于实测拱顶下沉数据,建立塌方时间预报的灰色-协同理论模型。
In addition, comparison of arch crown settlement and horizontal convergence of haunch between in-situ testing data and computing ones shows that the variation laws fit preferably.
另外,现场实际量测拱顶下沉数据和拱腰水平收敛值与计算数据的相互比较表明,两者变化规律吻合较好。