In this stage, the lifting frame was fixed to a hook attached to a crane, and the hull was lifted completely clear of the seabed and transferred underwater into the lifting cradle.
在这一阶段,吊架固定在吊车的挂钩上,船体完全脱离海床,在水下被转移到吊篮里。
Bamboo is connected together with lashing and bamboo bolt to form a frame on the floor before being erected by crane.
竹子与绳子和竹螺栓连接在一起形成一个地板上的框架,然后再由起重机吊立。
A study is provided here for the application of plastic design to the industry building frame with medium or light crane loading.
本研究为在中、轻级工作制的吊车厂房刚架结构中应用塑性设计,提供了研究成果。
应用推荐