It is understood that part of Matsuura Pylon cable-stayed bridge cables district, a total of 108 cable assembly here, the segments involved in a great ring pre-stress, cable conduit installation, the steel beam positioning gear block anchor Construction of very high precision. According to preliminary estimates, the segment of cable-stayed to carry tens of thousands of tons of nuclear set pull, the whole tower of the largest part of the force. Matsuura Bridge, Central Command area of cable-stayed bridge to prestressed cables, cords and duct construction and installation to take GPS global satellite positioning system for spatial orientation, select no wind, no sun in the morning and evening measurements, measured twice a day, any size guarantee 100 meters altitude error of less than 10 mm to ensure the accuracy of the construction.