The activity duration of crop is about 40 days, two times the period.
作物旺盛生活期为40天,相当于两个周期。
There is a five second activity duration to account for the serial transfer of data to the printer.
需要用五秒钟的活动持续时间来安排到打印机有序传输数据。
A. Lengthen the estimated activity duration for all activities scheduled to occur the following winter.
把以后几年冬季要发生的所有活动的估算历时都加长。
应用推荐