The axial load and centralizer spacing from the bottom to the top are calculated by using the mechanical analysis method and the well trajectory data.
采用力学分析的方法,结合井眼轨迹数据,由下到上逐跨计算了抽油杆柱的扶正器间距和轴向力。
The axial load and centralizer spacing from the bottom to the top are calculated by using the mechanical analysis method and the log data.
采用力学分析的方法,结合测井资料,由下到上计算了抽油杆柱的扶正器间距和轴向力。
应用推荐