This paper presents a design example of using a cable crane for lifting and erecting an access bridge for the right bank spillway tunnel for the Lubuge Hydropower Station.
这里介绍了应用于鲁布革右岸泄洪洞交通桥吊装的缆索起重机的设计实例。
The said method can be applied to design calculation of practical engineering structures such as super large bridge crane, track laying machine, bridge erecting machine, gantry crane and...
文中所述方法与经验可普遍推广应用于超大型桥式起重机、铺轨架桥机、龙门行车与多片式抢修钢桥等实用工程结构物的设计计算。
The said method can be applied to design calculation of practical engineering structures such as super large bridge crane, track laying machine, bridge erecting machine, gantry cran…
文中所述方法与经验可普遍推广应用于超大型桥式起重机、铺轨架桥机、龙门行车与多片式抢修钢桥等实用工程结构物的设计计算。