Based on the cable-stayed bridge using method of cantilever, the paper establishes the optimization model of construction phase with multi-objective and multi-constraint and gives the example.
采用多目标、多约束的优化方法,以悬臂施工主梁的斜拉桥为例,建立了施工阶段的优化模型,并给出算例。
The article describes the monitor objective, method, data analysis, regulating control measures and monitoring result in the course of cantilever concreting construction of the bridge.
文章介绍了该桥在悬臂浇筑施工过程中监控的目标、方法、数据分析、调控措施和监控效果。
Research purposes: Suspended basket construction is a main method in cantilever construction.
研究目的挂篮施工方法是悬臂施工中的一种主要施工方法。
应用推荐