The control methods and system design of centralized control in coal preparation Plant are discussed in this paper. Some ideas of solving the problems in system design are given.
就当前一些选煤厂集控中的控制方式、系统设计等方面进行了论述,并对系统设计中出现的问题及解决方法提出看法。
The design is the Luling coal preparation plant, the first part of this thesis introduces the position of plant area and general geography situation and the base of raw coal of Luling Mine.
本设计是芦岭选煤厂的主厂房,这篇论文首先介绍芦岭矿厂区位置、地理概况和原料煤基地。
Technology design of coal preparation plant.
选煤厂工艺设计。
应用推荐