... expert evaluation after death 死亡后鉴定 cost of expert evaluation 鉴定费用 postmortem expert evaluation 死亡后鉴定 ...
基于4个网页-相关网页
With components evaluation and expert evaluation, the comparative analysis of the actual efficacy index, cost index and price index of sample project is made.
应用给分量化评估和方案专家评估方法,对样本项目实际施工功效指数、成本指数和价格指数进行比对分析;
Two maintenance interval models with maximum availability and average cost are proposed, and the importance of the two is determined by the way of expert evaluation.
提出了可用度最大和平均维修费用最低的两种维修间隔期模型,采用专家评分的方式确定二者的重要度,通过计算得出最佳维修间隔期。
应用推荐