This thought and method of studying dam foundation rock mass quality can be extended to other water-power projects.
这种研究坝基岩体质量的思路、方法可以推广到其它水电工程。
参考来源 - 坝基岩体质量量化分级及图形展示The safety evaluation on the model experiment indicates that the global safety factor for the dam foundation and abutment is 4.7-5.0. In addition, the reinforcing measures for the weak areas are advised.
通过试验获得了坝肩坝基的变形及分布特征、失稳的破坏形态和破坏机理,确定了拱坝坝肩坝基整体稳定安全度为4.7~5.0,评价了工程的安全性,并针对坝肩的薄弱环节提出了加固处理措施建议。
参考来源 - 期刊学术社区·2,447,543篇论文数据,部分数据来源于NoteExpress
By curtain grouting, the dam foundation is reinforced and the leakage is reduced.
经过坝基防渗补强灌浆,加强了坝基质量,减少了渗漏。
Uncertainty may exist in dealing with the mechanism of local uplift anomaly on dam foundation.
坝基局部扬压力异常机理的分析中通常存在不确定性。
The contrast test in made with clay solidification slurry and cement grant in permeable dam foundation.
用粘土固化浆与水泥浆在坝基强透水地层做了高喷截渗时比试验。