Wetland design can moderate peak flow rate and volume of runoff discharge and sediment deposition during precipitation events.
湿地项目可以缓和雨洪峰值流率及降水过程中的径流排放量和沉淀量。
The method was adapt broad crested weir theory derivation to calculation flood rate of discharge and conjecture design rate of discharge through field investigate information of bridge.
该计算方法是通过实地调查桥前水深等资料,采用严密的宽顶堰理论推导,求得洪水流量,进而推求设计流量。
The relation of design flood peak discharge rate to collecting area in Nenjiang River basin was discussed in this paper.
探讨嫩江流域主要水文站设计洪峰流量与流域面积的关系。
应用推荐