It is indicated that the dynamic amplification of abutment rock body and dam-water-foundation interaction should be considered in the aseismatic stability analysis for high arch dam abutment.
指出高拱坝坝肩稳定分析应考虑坝肩岩体的动力放大和坝-地基-库水的动力相互作用,算例表明所提方法的实用价值。
Dynamic analysis for the crane-load or the trolley-load system is the foundation for solving the problem of the cranes fast contraposition.
对起重机吊重系统的动力学分析是解决起重机快速对位问题的基础。
A simplified method for the dynamic analysis of the structure-foundation interaction of offshore platforms is presented in this paper.
本文提供了一个分析结构——基础耦合响应的简化方法。
应用推荐