In order to solve the problem of insufficient measured modes in the dynamic model updating, a direct model updating method using added known stiffness components is proposed.
为了解决模型修正中所需要模态数据不足的问题,提出了一种基于附加已知刚度的模型修正直接方法。
The updating result indicates that the physical conception of this combined static and dynamic model updating method is definite and can fully use the static and dynamic testing data.
修正结果表明:这种联合静动力的模型修正方法物理概念清楚,能充分利用静动力测试数据,经过修正后的有限元模型能够反映该桥的实际工作状态。
Updating the data model and creating dynamic GUI elements.
更新数据模型和创建动态gui元素。
应用推荐