float adjustment on line 线路上的浮标
If the tank is not filling all the way (there should be a fill line on the inside of the tank), carefully bend the bulb of the float valve up a bit and see if the tank will fill.
如果水箱没有充满正常水量(水箱内侧应该有一条水位线),慢慢地弯曲一下浮囊阀,看水位会不会上升。
The PLC double redundant control sys- tem structure , hardware configuration and software running status were described on the basis of PROFIBUS-DP field bus on float glass line .
论述了基于PROFIBUS-DP现场总线的浮法玻璃生产线的PLC双冗余控制系统结构、硬件组态以及软件实现情况。
This paper describes the causes of Angle bump of float glass when conveyed at the cold end while being longitudinally cut on the production line.
探讨了浮法玻璃在冷端输送过程中,玻璃板在主线上纵向掰断并分开所产生的两块玻璃尾端碰角的现象。
应用推荐