The Columbia and Snake River system allows large volumes of freighttobe moved with negligible impact on air quality, and replacing this transportation capacity would require use of 120, 000 rail cars or 700, 000 trucks.
This will only start after the first mobile crane begins operating to ensure freight can still be transferred to and from the shore throughout the project.