The design is the Luling coal preparation plant, the first part of this thesis introduces the position of plant area and general geography situation and the base of raw coal of Luling Mine.
本设计是芦岭选煤厂的主厂房,这篇论文首先介绍芦岭矿厂区位置、地理概况和原料煤基地。
The 3rd chapter discussion on functional programming: location, position of general functions, service module design, general layout design, and the current situation of P. G. Logistics Shunde Base.
第三章结合宝供顺德物流基地的实际,分别从项目选址、总体功能定位、服务功能模块设计、总平面规划四个方面对其功能规划进行探讨。
应用推荐