It provides important reference for Longtan high RCC dam design and construction.
为龙滩高碾压混凝土重力坝设计和施工提供了重要的参考依据。
Jinghong hydropower station RCC dam is in the subtropics zone, the high temperature continues very long and the temperature control in dam construction is very difficult.
景洪电站地处亚热带,高气温时间长,大坝碾压混凝土施工温控难度高。
Aimed at the design demand of high RCC gravity dam for Longtan project that is about to start, the results of studies will provide the important reference basis.
研究工作针对龙滩高碾压混凝土重力坝设计的需要,其成果为即将开工的龙滩工程建设提供了重要的参考依据。
应用推荐