... · Molding Prototype 大货品样板 · Mass Production Testing 大货产品测试 · Mass Production 大货生产 ...
基于1个网页-相关网页
The piece said that Apple had originally planned mass production in January, but that the schedule has been pushed back due to testing for the device’s firmware.
报道称,苹果公司最初计划在2011年1月开始大规模生产iPad 2,但由于设备韧体测试而推迟了计划。
Apple supposedly planned to have Foxconn start cranking out iPad 2s in January, but has pushed back mass production while it finishes testing the system's firmware.
苹果可能计划让富士康在一月完成iPad2制作,但是大批量的生产将会在完成系统的固件测试之后。
While in Japan, Honda is testing a car that runs off of water, it may be 3-10 years before it is available in mass production.
而在日本,本田汽车运行试验过的水,它可能是3-10年,也可在大规模生产。
应用推荐