Problems existing in 2050 mm hot strip mill descaling station of Bao Steel Group are discussed and also the possible solutions.
介绍了宝钢2050热轧除鳞装置存在的问题及解决方法。
Roughing setting up mathematic model is adopted in the width control of 1780 mm hot strip mill of Anshan Iron and Steel Group Corporation.
在鞍钢热轧带钢厂1780生产线的宽度控制中,主要采用了粗轧设定数学模型。
Process automation system for Laiwu Steel 1500 mm hot strip mill is described, include system figuration, network, functions of middle ware and application.
介绍了莱钢1500热轧带钢过程自动化系统,包括系统配置、网络结构、中间件和应用软件的主要功能模块。
应用推荐