...模型校正;地下水位;杨树人工林 [gap=1501]Key words: soil and water conservation; MIKE SHE hydrological model; model calibration and validation; ground water table; poplar plantation ..
基于1个网页-相关网页
model validation and calibration 模式检验和标定
Through parameter calibration and model validation, model can be adapted to morphogenesis and LAI simulation for different varieties and management practice.
通过对模型参数的校正和核实,使模型适应于不同类型品种的形态发生和LAI动态模拟。
The main requirements for cm operational conceptual hydrologic model are function development, model calibration, and validation followed by production of forecast runs and analysis of results.
功能改进,模型率定,模型预报的验证以及其结果分析是应用概念水文模型所需要的几个主要部分。
Meanwhile, the factors affecting the calibration model were studied and the validation was done by the actual sample.
同时对影响模型的因素进行了研究,并用实际样品进行了验证。
应用推荐